Anping Changfeng filter material factory

Hebei Changfeng Filter Material Co., Ltd. One-stop solution for Filter production

Manufacturer from China
Site Member
5 Years
Home / Products / Air Filter Adhesive /

800-1000MPa.S Air Filter Adhesive , Silicone Two Component Epoxy Adhesive

Contact Now
Anping Changfeng filter material factory
City:hengshui
Province/State:hebei
Country/Region:china
Contact Person:MsAnni
Contact Now

800-1000MPa.S Air Filter Adhesive , Silicone Two Component Epoxy Adhesive

Ask Latest Price
Video Channel
Brand Name :Chang Feng
Model Number :9009-54-3
Certification :ISO9001
Place of Origin :China, Hebei,
MOQ :5 / Tons
Price :Negotiable
Payment Terms :L/C, T/T
Supply Ability :20 Ton/Tons per Month PU glue A black and B for heavy duty air filter production
Delivery Time :8-10 work days
Packaging Details :mental drum
Product name :Air Filter Adhesive
component proportion ratio :25%
EINECS No :210-898-8
MF :Mixture
Quality :Top-quality
Material :100% Silicone
Type :Two Component
Color :orange-red and brown-yellow
Keywords :Hot Melt Adhesive Products
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Blue And Red PU Glue Customized Capacity For Air Filter/Air Filters Material

1. Product introduction

Two-component polyurethane adhesive for machine

component proportion ratio is 100:25

2. Parameter table

Two-component polyurethane adhesive for machine

component proportion ratio is 100:25

Material-A Material-B
Weight Small barrel :25KG 6.25KG
Big barrel :50KG 12.5KG
Physical nature orange-red viscous liquid (color based on your request to configure) brown-yellow liquid
viscosity 800-1000MPa.S(25°C) 25-50MPa.S(25°C)
density 1.02g/ml 1.02g/ml
package Plastic bucket or Tin bucket Plastic bucket ,Tin bucket, Plastic pots
storage 1. Material-A and material-B can store up 3-6 months.
2. To appropriate indoor storage above 15°C

3. Method of operation

1.The material must be full rocked after each to the plastic injection machine plastic injection so that the A material mixing evenly.

1.Everytime the plastic injection machine plastic injection A material must be full before the shaking in order to the material until

2.AB material proportioning ratio of A:B=100:25 or 4:1.28°C,you can start operation

3.Material temperature controlled 24°C-28°C appropriate then you can start operation.

4. Must be clean before using the mould release agent (Note:

The new plastic mould can be wiped free)

5 .If A and B is not reaction please measuring A and B ratio.

6. A and B must be sealed to .To avoid the air and water vapor reaction, as a result affecting the effect of colloidal

4. Do’s and don’ts

1. The products are generally stored in a dry room, and pay attention to water, moisture and sun. Must cover the plug and cover, to avoid absorbing rubber moisture in the air, affect the results

2. Mould must be painted in front of the mould release agent,to be poured glue dry before.

3. A.B glue in ordinary temperature of 25 °C properly used, if the temperature is too high or too low will affect the use effect. You must use artificial methods of cooling or heating.

800-1000MPa.S Air Filter Adhesive , Silicone Two Component Epoxy Adhesive800-1000MPa.S Air Filter Adhesive , Silicone Two Component Epoxy Adhesive800-1000MPa.S Air Filter Adhesive , Silicone Two Component Epoxy Adhesive800-1000MPa.S Air Filter Adhesive , Silicone Two Component Epoxy Adhesive

Inquiry Cart 0